Jewish Care – Toilet Refurbishment

G&L won a min-tender competition to undertake the works to refurbish existing ground floor toilets and turn them into functioning wet rooms with disabled access WC’s for the residents.

Read More

Watford Grammar School for Boys

G&L undertook timber sash window replacements across 3 floors at the front elevation of the school, as well as carrying out flat roof repairs to all dormers.

Read More

Lambert Smith Hampton

This was an end of lease dilapidations project – G&L carried out a complete strip out of an outgoing client’s fixtures and fittings.

Read More

Synergy Property Consultants

Working with Synergy Property Consultants, we were tasked with upgrading all fire doors and screens at the client’s request across two schools over one summer.

Read More

TMD Building Consultancy

A Cat A/B refurbishment for a client looking to move into new premises. Works included a strip out of the existing office space, installation of a steel mezzanine floor and stairwell, construction of a 60min fire rated jumbo stud partition wall and a breeze block wall below the mezzanine.

Read More

Jones Lang La Salle

An end of lease dilapidation project which required a set of works that is common across these units. We installed new emergency lighting along the block wall, high-level UFO lighting, decorated all elevations and internal office and WC space.

Read More

Essex Constabulary

G&L won a mini-tender competition to work at Stevenage Police Station to complete remedial works to the parapet walls at each corner of the main building.

Read More